End-to-end test and repair: keeping your systems running.


A FULL RANGE OF PIPELINE AND FACILITY INTEGRITY SERVICES

We provide a one-stop service for pigging and operational pressure testing. This includes survey, planning, materials, management and third-party services (water trucks and fluid disposal). We also anomaly dig and repair or replace where needed and have supporting systems and software to make it easy to manage your integrity programs.

This end-to-end service means our clients can keep their pipelines running at optimal pressure, and their facilities at maximum uptime. It also allows for the efficient management of safety, risk, and compliance – and mitigates against unplanned downtime associated with unexpected failures.

Our best-in-class mobile hydro testing service team is highly skilled and fully certified by VeriSource™. Our modern testing equipment tests up to 7,000psi and we provide detailed and auditable records and reports for every project. We also provide inspection and pneumatic testing and will efficiently repair anomalies, quickly mobilizing crews to fix issues should they arise. Whatever your integrity needs, we have you covered.


ENHANCED SAFETY

  • Experienced leadership
  • Trained and VeriSource™ certified personnel
  • Best-in-class equipment
  • Engineered and optimized test procedures
  • Proven safety and risk management systems

ENHANCED PERFORMANCE

  • End-to-end test and fix solutions
  • Rapid response anomaly repairs
  • MAOP program support
  • Proprietary data hosting
  • Risk-based inspection experts
  • GIS visualization
  • Professional and auditable reports

TECHNICAL ADVANTAGES

We support vessel pressure certification for separators, scrubbers, tanker trucks, and hydro-vac units as well as pneumatic and hydro tests, helping clients manage class changes, leaks, line reversals, and other integrity challenges that can affect safety and performance.

 

HYDROTESTING CAPABILITIES


Unit, GPM, PSI, Testing Capability

  • Unit 1 - GT 80
  • 29 Gallons Per Minute
  • 2,900 PSI
  • Up to 12 miles of 10"
  • Unit 2 - GT 73
  • 9 Gallons Per Minute
  • 7,500 PSI
  • Smaller pipelines

INTEGRITY PROGRAM MANAGEMENT


In addition to fieldwork, our proprietary software BuildME™ Inspect offers a proven integrated system to host asset registers and pipeline segmentation, manage risk-based inspection programs, host operations, and inspection data, manage anomalies, and includes GIS visualization. We fully support 49 CFR 192 MAOP program compliance.


FOR MORE INFORMATION ON TESTING, CONTACT:
Antonio Rodriguez
Hydro Test Foreman
Tel: (830) 243-0503
antonio.rodriguez@wandwenergy.comantonio.rodriguez@wandwenergy.com

FOR MORE INFORMATION ON INTEGRITY SYSTEMS, CONTACT:
Kevin Fordham
Regional Manager
Tel: (832) 618-9135
kevin.fordham@wandwenergy.comkevin.fordham@wandwenergy.com